Facilities & Infrastructure

Kabil Integrated Industrial Estate (KIIE)





CITRANUSA KABIL
INTERNATIONAL CARGO PORT

PORT INFORMATION :
Berth 1 ( length 130 m ) - for Tug & barges up to 2,000 DWT with water draft up to 5m LWS

Berth 2 ( roro ramp ) - for RoRo operation with Landing Craft /LCT, water draft up to 5m LWS

Berth 3 ( length 176 m ) - for berthing of Vessel up to 30.000 DWT with water draft up to 10m LWS.

Berth 4 - for liquid cargo

Berth 5 & 6 ( @ length 277.5 m ) - for berthing of Vessel up to 40.000 DWT with water draft up to 12.5m LWS






Power Plant within the estate
(co-operation with PLN Batam, a state owned company)

Within the estate PLN Batam is currently operating 30 MW,
50 MW Power Plant also linked to SolarPV project with PLN,
150 KV Gas Insulated Switchgear (GIS) aligned with the current 682 MW island-wide electricity network. 10 MW SolarPV generated from 6 HA water reservoir & warehouse rooftop within the estate JV with PLN to build up





power 1
power 2
power 3
power 4

Industrial Water

The Estate has 2 water resources, from estate owned 6 HA - water reservoir producing 5200 M3 industrial water daily & BP Batam supply 2200 M3 industrial water perday.

Reservoir Capacity :
u/t 400.000 M3

Water pressure :
Uu/t 3 bars

Industrial water capacity :
Currently from 2 source with daily capacity u/t 7.400 M3 / Day

Piping :
6” for main pipe, 3” within the estate


Gas Pipe Line


Gas supplied by the Government through PGN using the Grissik-Batam-Singapore transmission pipeline, carrying gas from the ConocoPhillips & PetroChina field to Batam with volumes in excess of 800 MMScfd (Million Standard Cubic Feed per Day) or 22.6 million m3/day transmitted through its 5,900 km long transmission and distribution pipeline network.

Gas pressure : 10 bars

Gas Energy : 10 BBtuD

Gas Piping : 12” via main road 6” within the estate